paving-1b7908230ad944e09418ee484fda9015

Due to the deterioration of the roadway and crew availability, the City of Alexandria has determined that E. Glebe Road between Route 1 and Commonwealth Avenue needs to be repaved as soon as possible due to its current condition.

Therefore, the paving will begin on Monday, November 9 and last approximately one week.

During all times of construction, at least one lane will remain open for reversible traffic, maintained by traffic control and flaggers.

After the paving is complete, the center line will be marked with temporary tape so that thermoplastic can be installed at a later date, most likely in the Spring, after the public outreach has been completed to determine other improvements to the road, such as bike facilities and crosswalks.

The City is planning to do a “Complete Streets” project for the street in the Spring of 2016, and there will be public outreach with the Lynhaven community this Winter to begin discussion on the additional needs for the road.

For more information, contact Jeff DuVal, Deputy Director of Operations  at 703.746.4103.

forumVia the neighborhood forums, local Alexandria, Virginia mom and style blogger Maria Jose Ovalle of Very Busy Mama and The Pink Armoire Fashion Bus will be on site at the corner of Montrose Avenue and Wesmond Drive in Lynhaven this Sunday, July 12 from 2-4pm.

Shop summer styles and accessories for under $50!

The Pink Armoire, which is locally owned and operated is known and dedicated to brining women THE look for less, making you look stylish at wallet friendly prices.

They have partnered with Maria Jose whose blog and life motto is that all women, no matter their size, budget or time constraints should look and feel their best always!

More details at this link.

Real Time Analytics