Metrorail Track Work This Weekend – March 20-22, 2015

Via WMATA, reconstruction of the Metrorail system will continue over the weekend of March 20-22 with track work and service adjustments on four of six rail lines.

This weekend, Red and Green line trains will operate at regular intervals. Orange, Silver, Blue and Yellow line trains will operate every 18 minutes.

Red Line

Regular weekend service

Orange Line

Orange Line trains will operate every 18 minutes throughout the weekend to coordinate with rebuilding on other lines.

Silver Line

Silver Line trains will operate every 18 minutes throughout the weekend to coordinate with rebuilding on other lines.

Blue Line

Blue Line trains will operate every 18 minutes throughout the weekend.

Work Performed: Rail replacement, joint elimination, tie and insulator renewal for a safer, more comfortable ride. To support this work, Blue Line trains will share one track between Braddock Road and Reagan National Airport.

Yellow Line

Trains every 18 minutes (Huntington to Mt Vernon Sq only)

Yellow Line trains will operate every 18 minutes throughout the weekend between Huntington & Mt. Vernon Sq only. If you are traveling to or from a station north of Mt. Vernon Sq, use a Green Line train to complete your trip.

Work Performed: Rail replacement, joint elimination, tie and insulator renewal for a safer, more comfortable ride. To support this work, Blue Line trains will share one track between Braddock Road and Reagan National Airport.

Green Line

Regular weekend service