Interstate 95 - Virginia

Both of the southbound I-95 collector/distributor lanes for Dale Boulevard (Exit 156) will intermittently close between 9:00 p.m. Thursday, March 19 and 5:00 AM Friday, March 20. Each closure will last up to 20 minutes.

During the full closures, southbound I-95 motorists will not be able to access the ramp to eastbound Dale Boulevard/Route 784, nor will westbound Dale Boulevard motorists be able to access southbound I-95.

There will also be single lane closures in the collector-distributor lanes between 9:00 PM and 5:00 AM. There will also be closures of the right southbound I-95 through lane.

Message signs will be posted in advance of the work so that motorists can use alternate routes.

The closures are needed in order to replace overhead sign structures.

(Image Interstate 95 – Virginia by Doug Kerr, on Flickr)

Clinton Portis and Chris Cooley

Interesting Area News

While you slept, showered, shaved, and got your Starbucks, we scanned the local papers, blogs, and websites to find the most interesting stories in them you might have missed.

  • Chris Cooley: The Redskin you could count on when you couldn’t count on the Redskins (Washington Post)
  • Own a piece of history! Gadsbys Tavern Ice Well bricks are for sale (Old Town Alexandria Patch)
  • If you heard a lot of fire trucks going by the area last night, this was the reason (NBC Washington)
  • How will a casino at National Harbor affect Alexandria? (Alexandria Times)
  • After two years of renovation, Lincoln Memorial Reflecting Pool reopens this weekend (DCist)

Photo credit: Keith Allison on Flickr

Wednesday, Oct. 12 and Thursday, Oct. 13 NIGHTLY
from 9 p.m. – 5 a.m. the next morning:

At 9 p.m. each night, the right lane of the Capital Beltway Outer Loop (I-95/495 North) will be closed between the Eisenhower Avenue Connector and Telegraph Road for roadway construction. The middle lane will also be closed each night starting at 11 p.m., leaving one lane open in this corridor. All lanes will reopen by 5 a.m. the next morning.

Additionally, the Woodrow Wilson Bridge Project will be reopening access from Pershing Avenue westbound to Telegraph Road North on Saturday morning, October 8. This access will be regulated by a stop sign.

Please use caution when traveling in this area. All construction-related work and dates are subject to change, depending on weather, material and contractor availability or other unforeseen conditions.

For More Information

Go to www.wilsonbridge.com for the latest traffic and project information.

Motorists urged to use alternate routes to avoid delays

Weather permitting, the Woodrow Wilson Bridge Project will be closing the exit ramp from the Capital Beltway Inner Loop (I-95/495 South) to Telegraph Road South on Friday, June 24 from 9 a.m. to noon for ramp construction. This work will have significant impacts on local traffic and motorists are advised to seek alternate routes to avoid delays.

Variable message signs will be posted throughout the area with detour routes. The detours are as follows:

  • For motorists traveling on the THRU lanes, continue on the Inner Loop and take the exit for S. Van Dorn Street. Return on the Outer Loop to the exit for Telegraph Road South.
  • For motorists traveling on the LOCAL lanes, take the exit for Pershing Avenue to right on Stovall Street to right on Eisenhower Avenue to right on Mill Road to Telegraph Road South.

Please use caution when traveling in this area. All construction-related work and dates are subject to change, depending on weather, material and contractor availability or other unforeseen conditions.

For More Information

Go to www.wilsonbridge.com for the latest traffic and project information.

Motorists urged to use alternate routes to avoid delays

Weather permitting, the Woodrow Wilson Bridge Project will be conducting closures in the Telegraph Road Interchange of the Capital Beltway for ramp realignment work overnight on Monday, June 20.  This work will have significant impacts on local traffic and motorists are advised to seek alternate routes to avoid delays. Variable message signs will be posted throughout the area with detour routes.  The scheduled impacts are as follows.

Monday, June 20 from 9 p.m. 5 a.m. the next morning:

  • The exit ramp from the Capital Beltway Inner Loop (I-95/495 South) to Telegraph Road South will be closed for ramp reconfiguration.
    • Detours: For motorists traveling on the THRU lanes, continue on the Inner Loop and take the exit for S. Van Dorn Street.  Return on the Outer Loop to the exit for Telegraph Road South. For motorists traveling on the LOCAL lanes, take the exit for Pershing Avenue to right on Stovall Street to right on Eisenhower Avenue to right on Mill Road to Telegraph Road South.

Monday, June 20 from 11 p.m. to 5 a.m. the next morning:

  • Huntington Avenue will be reduced to one lane between Kathryn Street and Telegraph Road to move construction equipment.  There will be flaggers on-site to alternately stop eastbound and westbound traffic.

Please use caution when traveling in this area. All construction-related work and dates are subject to change, depending on weather, material and contractor availability or other unforeseen conditions.

For More Information

Go to www.wilsonbridge.com for the latest traffic and project information.