In case you missed it, traffic in the Old Town area, including Carlyle, was a real mess due to an overturned truck on the outer loop of the Wilson Bridge. Here are some photos.

Shots of traffic around Carlyle due to Wilson Bridge accident - July 5, 2013

Travel on Duke Street East toward Old Town and Route 1 North was a mess.

 

Shots of traffic around Carlyle due to Wilson Bridge accident - July 5, 2013

Traffic was even backed up on John Carlyle Street from Eisenhower Ave due to yesterday’s traffic accident on the Wilson Bridge

 

Shots of traffic around Carlyle due to Wilson Bridge accident - July 5, 2013

Traffic around John Carlyle Square Park was chock-a-block due to yesterday’s accident on the Wilson Bridge

If you’re out late Sunday (e.g. celebrating the Texans victory over the Patriots), see this tweet from Congressman Gerry Connolly:

For more information, see this Dr. Gridlock post on WashingtonPost.com.

Motorists strongly urged to use
alternate routes to avoid significant delays

Weather permitting, the Woodrow Wilson Bridge Project will continue ramp and road closures in the Telegraph Road/Capital Beltway interchange this week and weekend. This work will cause significant local traffic impacts and motorists are encouraged to use alternate routes. Variable message signs will be posted to alert drivers and provide detour information.

The scheduled work is as follows, roughly in chronological order:

Monday, Aug. 6 OVERNIGHT from 9 p.m. to 5 a.m. the next morning:

  • The right lane of Inner Loop LOCAL (I-95/495 South) will be closed between U.S. Route 1 and Telegraph Road. All other lanes will remain open.
  • The access ramps from U.S. Route 1 North and South to the Inner Loop LOCAL will be closed. Detours: Motorists will be routed to the Inner Loop THRU Lanes. Access to the Telegraph Road ramps will be closed.

Monday, Aug. 6 OVERNIGHT from 10 p.m. to 5 a.m. the next morning:

  • The left lane of the Outer Loop (I-95/495 North) will be closed between the Van Dorn and Eisenhower Connector interchanges. There will be a complete closure for 15 minutes just after midnight.

Monday, Aug. 6 and Tuesday, Aug. 7 NIGHTLY from 9 p.m. to 5 a.m. the next morning:

  • The Inner Loop and Outer Loop exit ramps to Telegraph Road North will be closed. Detours: Inner Loop travelers should continue to the Eisenhower Connector exit to Eisenhower Avenue East to the traffic circle to Holland Lane to Duke Street. Outer Loop travelers should take the Eisenhower Avenue exit and stay straight onto Stovall Street to left on Pershing Avenue to Telegraph Road North.
  • The Inner Loop exit ramp to Pershing Avenue will be closed. Detour: Continue to the Eisenhower Connector exit to Eisenhower Avenue East to Stovall Street.

Monday, Aug. 6 through Wednesday, Aug. 8 NIGHTLY from 9 p.m. to 5 a.m. the next morning:

  • The exit ramp from the Inner Loop to Telegraph Road South will be closed. Detour: Motorists should continue on the Inner Loop to the Eisenhower Connector to Eisenhower Avenue East to Telegraph Road South.

Monday, Aug. 6 through Thursday, Aug. 9 NIGHTLY from 9 p.m. to 5 a.m. the next morning:

  • The access ramps from Telegraph Road North and South to the Inner Loop will be closed. Detours: Northbound motorists should continue to Duke Street West to Van Dorn South to on-ramp to the Inner Loop. Southbound motorists should continue to the ramp to Huntington Avenue East to U.S. Route 1 North to the on-ramp to the Inner Loop.

Tuesday, Aug. 7 through Thursday, Aug. 9 DAILY from 9:30 a.m. to 3 p.m. and Friday, Aug. 10 from 9:30 a.m. to noon:

  • The exit ramp from the Outer Loop to Telegraph Road South will be closed. Detour: Motorists should continue to U.S. Route 1 South to right on Huntington Avenue West to left on Telegraph Road South.

Tuesday, Aug. 7 and Wednesday, Aug. 8 NIGHTLY from 9 p.m. to 5 a.m. the next morning:

  • The access ramps from Telegraph Road North and South to the Outer Loop will be closed. Detours: Northbound motorists should continue to Huntington Avenue East to U.S. Route 1 North to the on-ramp to the Outer Loop. Southbound motorists should continue to Duke Street East to U.S. Route 1 South to the on-ramp to the Outer Loop.

Tuesday, Aug. 7, Thursday, Aug. 9 and Friday, Aug. 10 NIGHTLY from 9 p.m. to 5 a.m. the next morning:

  • The exit ramp from the Outer Loop to Telegraph Road North will be closed. Detour: Motorists should continue to U.S. Route 1 North to Duke Street.

Wednesday, Aug. 8 and Thursday, Aug. 9 NIGHTLY from 9 p.m. to 5 a.m. the next morning; ALSO CONTINUOUSLY from 9 p.m. Friday, Aug. 10 to 5 a.m. on Monday, Aug. 13:

  • The Outer Loop exits to Huntington Avenue, N. Kings Highway and Telegraph Road South will be closed. Detours: Motorists should continue to U.S. Route 1 South to right on Huntington Avenue West to Telegraph Road to N. Kings Highway.

Thursday, August 9 OVERNIGHT 9 p.m. to 5 a.m. the next morning:

  • Southbound Telegraph Road will be completely closed between Duke Street and the Beltway. Detour signs will be posted on the road.
  • The ramp from Duke Street East to Telegraph Road South will be closed. Detour: Continue onto U.S. Route 1 South to right on Huntington Avenue West to Telegraph Road.
  • The ramp from Duke Street West to Telegraph Road South will be closed. Detour: Continue onto Van Dorn Street South to Franconia Road East to Telegraph Road.
  • Mill Road will be completely closed between Stovall Street and the Mill Road connector. Detour signs will be posted on the road.

Please use caution when traveling in this area. All construction-related work and dates are subject to change, depending on weather, material and contractor availability or other unforeseen conditions. Go to www.wilsonbridge.com for the latest traffic and project information.

Weather permitting, the Woodrow Wilson Bridge Project will be continuing ramp and road closures in the Telegraph Road/Capital Beltway interchange this week. This work will cause significant local traffic impacts and motorists are encouraged to use alternate routes. Variable message signs will be posted to alert drivers and provide detour information.

The scheduled work is as follows:

Monday, July 30 through Thursday, Aug. 2 DAILY from 9:30 a.m. to 3 p.m.; also Wednesday, Aug. 1 OVERNIGHT from 9 p.m. to 5 a.m. the next morning:

  • The on-ramp from Telegraph Road South to the Outer Loop (I-95/495 North) LOCAL will be closed for roadway construction. Detour: Motorists should continue to Telegraph Road South to the ramp to Huntington Avenue East to U.S. Route 1 North to the on-ramp to the Outer Loop.
  • The on-ramp from Telegraph Road North to the Outer Loop LOCAL will be closed for roadway construction. Detour: Motorists should take the ramp to Eisenhower Avenue to right on Eisenhower Avenue East to the traffic circle to Holland Lane to Duke Street East to U.S. Route 1 South to the on-ramp to the Outer Loop.

Monday, July 30 OVERNIGHT from 9 p.m. to 5 a.m. the next morning:

  • The exit ramps from the Inner Loop (I-95/495 South) to Pershing Avenue and to Telegraph Road North/Duke Street will be closed for roadway construction. Detours: Motorists should continue on the Inner Loop to the Eisenhower Connector exit to Eisenhower Avenue East to left on Stovall Street to Pershing Avenue, or continue on Eisenhower Avenue to the traffic circle to Holland Lane to reach Duke Street.

Monday, July 30 through Wednesday, Aug. 1 NIGHTLY from 9 p.m. to 5 a.m. the next morning:

  • The on-ramp from Telegraph Road South to the Inner Loop will be closed for bridge construction. Detour: Motorists should take the ramp to Huntington Avenue East to U.S. Route 1 North to the on-ramp to the Inner Loop.

Monday, July 30 through Thursday, Aug. 2 NIGHTLY from 9 p.m. to 5 a.m. the next morning:

  • The on-ramp from Telegraph Road North to the Inner Loop will be closed for bridge construction. Detour: Motorists should continue to Duke Street West to the Van Dorn on-ramp to the Inner Loop.

Monday, July 30, Tuesday, July 31 and Friday, August 3 NIGHTLY from 9 p.m. to 5 a.m. the next morning:

  • The exit ramps from the Outer Loop to Telegraph North/Duke Street and Eisenhower Avenue will be closed for roadway construction. Detour: Motorists should continue to the U.S. Route 1 exit North to Duke Street; from there they can continue west to Holland Lane to the traffic circle to Eisenhower Avenue.

Tuesday, July 31, Wednesday, Aug. 2 and Friday, Aug. 3 NIGHTLY from 9 p.m. to 5 a.m. the next morning:

  • The exit ramp from the Inner Loop (I-95/495 South) to Telegraph Road South will be closed for roadway construction. Detour: Motorists should continue to the Eisenhower Connector exit to Eisenhower Avenue East to Mill Road East to Telegraph Road South.

As a reminder, the Outer Loop LOCAL is restricted to a single lane to allow for final paving of the Outer Loop. THRU lanes into Maryland are open. There is no Eisenhower Avenue Connector access to the Outer Loop until August 6; detours are posted. Weather permitting, the above work will be completed and the Outer Loop THRU and LOCAL lanes will be fully open and in their final configuration on Monday morning, August 6.

Please use caution when traveling in this area. All construction-related work and dates are subject to change, depending on weather, material and contractor availability or other unforeseen conditions. Go to www.wilsonbridge.com for the latest traffic and project information.

Capital Beltway Outer Loop Restricted Overnight to
Single Lane at Telegraph Road Interchange on October 20

Motorists strongly urged to use alternate routes to avoid delays

Weather permitting, the Woodrow Wilson Bridge Project will be conducting a significant overnight Capital Beltway Outer Loop closure tonight, Thursday, October 20. Variable message signs will be posted to alert drivers. This work will have major impacts on Outer Loop traffic, and motorists are advised to seek alternate routes to avoid delays. The scheduled work is as follows.

Thursday, Oct. 20 from 9 p.m. until 5 a.m. the next morning:

The THRU lane of the Outer Loop will close at 9 p.m. from just before the Telegraph Road interchange to just after the interchange for roadway construction at the THRU/LOCAL split. Beginning at 11 p.m., the middle lane will also close, leaving a single LOCAL lane (the right lane) open to all traffic. All motorists should take the LOCAL lane to their destination, including THRU traffic bound for the Wilson Bridge and Maryland. All three lanes will reopen in this corridor by 5 a.m. Friday morning.

Please use caution when traveling in this area. All construction-related work and dates are subject to change, depending on weather, material and contractor availability or other unforeseen conditions.

For More Information

Go to www.wilsonbridge.com for the latest traffic and project information.