Motorists strongly urged to use alternate
routes to avoid significant delays

Weather permitting, the Woodrow Wilson Bridge Project will continue ramp and road closures in the Telegraph Road/Capital Beltway interchange area this week. This work will cause significant local traffic impacts and motorists are encouraged to use alternate routes. Variable message signs will be posted to alert drivers and provide detour information.

The scheduled work is as follows, roughly in chronological order:

Monday, Aug. 20 OVERNIGHT from 9 p.m. to 5 a.m. the next morning:

  • Telegraph Road North will be completely closed between Huntington Avenue and Duke Street. Detour: Motorists should take the Eisenhower Avenue ramp to Eisenhower Avenue East to the traffic circle to Holland Lane to Duke Street.
  • The exit ramp from the Outer Loop LOCAL to Telegraph Road North/Duke Street will be closed. Detour: Motorists should take continue to U.S. Route 1 North to left on Duke Street. UPDATE: THIS RAMP CLOSURE WILL ALSO TAKE PLACE TUESDAY NIGHT, AUG. 21.
  • The exit ramps from the Inner Loop LOCAL to Pershing Avenue and Telegraph Road North will be closed. Detour: Motorists should continue to the Eisenhower Connector exit and return on Eisenhower Avenue East to the Eisenhower Valley, or continue to the traffic circle to Holland Lane to Duke Street. UPDATE: THIS CLOSURE WILL ALSO TAKE PLACE TUESDAY NIGHT, AUG. 21.
  • The access ramps from U.S. Route 1 South and North to the Inner Loop LOCAL will be closed. Detour: Motorists should use the on-ramps to the Inner Loop THRU lanes.

Monday, Aug. 20, Tuesday, Aug. 21 NIGHTLY from 9 p.m. to 5 a.m. the next morning: UPDATE: THIS CLOSURE WILL ALSO TAKE PLACE THURSDAY AND FRIDAY NIGHTS, AUG. 23 AND 24.

  • The Inner Loop exit ramp to Telegraph Road South will be closed. Monday detour: Motorists should continue to the Eisenhower Connector exit to return on Eisenhower Avenue East to Mill Road to Telegraph Road South. Tuesday detour: Motorists should continue to the exit for Van Dorn Street South to return on the Outer Loop to the exit to Telegraph Road South.

Monday, Aug. 20 through Friday, Aug. 24 NIGHTLY from 9 p.m. to 5 a.m. the next morning:

  • The access ramp from Telegraph Road South to the Outer Loop will be closed. Detour: Motorists should take the ramp to Huntington Avenue East to U.S. Route 1 North to the on-ramp to the Outer Loop.

Tuesday, Aug. 21 through Friday, Aug. 24 DAILY from 7 a.m. to 4 p.m.:

  • Mill Road will be closed between Stovall Street and Telegraph Road. Detour: Motorists should turn left on Stovall Street to right on Eisenhower Avenue to right on Mill Road to Telegraph Road.

Tuesday, Aug. 21 through Thursday, Aug. 23 DAILY from 9:30 a.m. to 3 p.m.; also Friday, Aug. 24 from 9:30 a.m. to noon:

  • The right lane of the Outer Loop LOCAL will be closed between the Eisenhower Connector and U.S. Route 1 for roadway construction.

Tuesday, Aug. 21 OVERNIGHT from 9 p.m. to 5 a.m. the next morning:

  • Telegraph Road South will be completely closed between Duke Street and Huntington Avenue. Detours: Motorists traveling Duke Street West should continue to the Van Dorn interchange to Van Dorn South to Telegraph Road South. Motorists traveling on Duke Street East should continue to U.S. Route 1 South to Huntington Avenue West to Telegraph Road South.

Tuesday, Aug. 21 and Wednesday, Aug. 22 NIGHTLY from 9 p.m. to 5 a.m. the next morning:

  • The ramp from Telegraph Road North to Eisenhower Avenue will be closed. Detour: Motorists should continue to Duke Street to right on Holland Lane to the traffic circle to Eisenhower Avenue.

Tuesday, Aug. 21 through Friday, Aug. 24 NIGHTLY from 9 p.m. to 5 a.m. the next morning:

  • The access ramps from Telegraph Road North and South to the Inner Loop will be closed. Detours: Northbound motorists should continue to Duke Street West to Van Dorn Street South to the ramp to the Inner Loop. Southbound motorists have two detours: On Tuesday night, they should take Duke Street to either the Van Dorn or U.S. Route 1 access to the Inner Loop. On Wednesday through Friday nights, they should take the ramp to Huntington Avenue East to U.S. Route 1 North to the ramp to the Inner Loop.

Wednesday, Aug. 22 through Friday, Aug. 24 NIGHTLY from 9 p.m. to 5 a.m. the next morning – ONE OF THE FOLLOWING CLOSURES WITH OCCUR, BUT NOT BOTH AT THE SAME TIME: UPDATE: THIS CLOSURE IS NOW ALSO SCHEDULED FOR MONDAY NIGHT, AUG. 20.

  • The ramp from Telegraph Road to N. Kings Highway will be closed. Detour: Motorists should take the Huntington Avenue ramp to Huntington Avenue East to U.S. Route 1 South to N. Kings Highway.
  • The ramp from Telegraph Road to Huntington Avenue will be closed. Detour: Motorists should take the ramp to N. Kings Highway to U.S. Route 1 North to left on Huntington Avenue. Note that this ramp will remain open as the detour when the Telegraph Road South access ramp to the Outer Loop is closed (listed above).

Wednesday, Aug. 22 through Saturday, Aug. 25 NIGHTLY from 9 p.m. to 5 a.m. the next morning:

  • The exit ramps from the Outer Loop LOCAL to Telegraph Road South, Huntington Avenue and N. Kings Highway will be closed. Detour: Motorists should continue to U.S. Route 1 South to Huntington or N. Kings Highway West to Telegraph Road.

Friday, Aug. 24 OVERNIGHT from 9 p.m. to 5 a.m. the next morning:

  • The exit ramp from the Inner Loop to Telegraph Road South will be closed. Detour: Motorists should continue to the Eisenhower Connector exit to return on Eisenhower Avenue East to Mill Road to Telegraph Road South.

Please use caution when traveling in this area. All construction-related work and dates are subject to change, depending on weather, material and contractor availability or other unforeseen conditions. Go to www.wilsonbridge.com for the latest traffic and project information.

Motorists strongly urged to use
alternate routes to avoid significant delays

Weather permitting, the Woodrow Wilson Bridge Project will continue ramp and road closures in the Telegraph Road/Capital Beltway interchange this week and weekend. This work will cause significant local traffic impacts and motorists are encouraged to use alternate routes. Variable message signs will be posted to alert drivers and provide detour information.

The scheduled work is as follows, roughly in chronological order:

Monday, Aug. 6 OVERNIGHT from 9 p.m. to 5 a.m. the next morning:

  • The right lane of Inner Loop LOCAL (I-95/495 South) will be closed between U.S. Route 1 and Telegraph Road. All other lanes will remain open.
  • The access ramps from U.S. Route 1 North and South to the Inner Loop LOCAL will be closed. Detours: Motorists will be routed to the Inner Loop THRU Lanes. Access to the Telegraph Road ramps will be closed.

Monday, Aug. 6 OVERNIGHT from 10 p.m. to 5 a.m. the next morning:

  • The left lane of the Outer Loop (I-95/495 North) will be closed between the Van Dorn and Eisenhower Connector interchanges. There will be a complete closure for 15 minutes just after midnight.

Monday, Aug. 6 and Tuesday, Aug. 7 NIGHTLY from 9 p.m. to 5 a.m. the next morning:

  • The Inner Loop and Outer Loop exit ramps to Telegraph Road North will be closed. Detours: Inner Loop travelers should continue to the Eisenhower Connector exit to Eisenhower Avenue East to the traffic circle to Holland Lane to Duke Street. Outer Loop travelers should take the Eisenhower Avenue exit and stay straight onto Stovall Street to left on Pershing Avenue to Telegraph Road North.
  • The Inner Loop exit ramp to Pershing Avenue will be closed. Detour: Continue to the Eisenhower Connector exit to Eisenhower Avenue East to Stovall Street.

Monday, Aug. 6 through Wednesday, Aug. 8 NIGHTLY from 9 p.m. to 5 a.m. the next morning:

  • The exit ramp from the Inner Loop to Telegraph Road South will be closed. Detour: Motorists should continue on the Inner Loop to the Eisenhower Connector to Eisenhower Avenue East to Telegraph Road South.

Monday, Aug. 6 through Thursday, Aug. 9 NIGHTLY from 9 p.m. to 5 a.m. the next morning:

  • The access ramps from Telegraph Road North and South to the Inner Loop will be closed. Detours: Northbound motorists should continue to Duke Street West to Van Dorn South to on-ramp to the Inner Loop. Southbound motorists should continue to the ramp to Huntington Avenue East to U.S. Route 1 North to the on-ramp to the Inner Loop.

Tuesday, Aug. 7 through Thursday, Aug. 9 DAILY from 9:30 a.m. to 3 p.m. and Friday, Aug. 10 from 9:30 a.m. to noon:

  • The exit ramp from the Outer Loop to Telegraph Road South will be closed. Detour: Motorists should continue to U.S. Route 1 South to right on Huntington Avenue West to left on Telegraph Road South.

Tuesday, Aug. 7 and Wednesday, Aug. 8 NIGHTLY from 9 p.m. to 5 a.m. the next morning:

  • The access ramps from Telegraph Road North and South to the Outer Loop will be closed. Detours: Northbound motorists should continue to Huntington Avenue East to U.S. Route 1 North to the on-ramp to the Outer Loop. Southbound motorists should continue to Duke Street East to U.S. Route 1 South to the on-ramp to the Outer Loop.

Tuesday, Aug. 7, Thursday, Aug. 9 and Friday, Aug. 10 NIGHTLY from 9 p.m. to 5 a.m. the next morning:

  • The exit ramp from the Outer Loop to Telegraph Road North will be closed. Detour: Motorists should continue to U.S. Route 1 North to Duke Street.

Wednesday, Aug. 8 and Thursday, Aug. 9 NIGHTLY from 9 p.m. to 5 a.m. the next morning; ALSO CONTINUOUSLY from 9 p.m. Friday, Aug. 10 to 5 a.m. on Monday, Aug. 13:

  • The Outer Loop exits to Huntington Avenue, N. Kings Highway and Telegraph Road South will be closed. Detours: Motorists should continue to U.S. Route 1 South to right on Huntington Avenue West to Telegraph Road to N. Kings Highway.

Thursday, August 9 OVERNIGHT 9 p.m. to 5 a.m. the next morning:

  • Southbound Telegraph Road will be completely closed between Duke Street and the Beltway. Detour signs will be posted on the road.
  • The ramp from Duke Street East to Telegraph Road South will be closed. Detour: Continue onto U.S. Route 1 South to right on Huntington Avenue West to Telegraph Road.
  • The ramp from Duke Street West to Telegraph Road South will be closed. Detour: Continue onto Van Dorn Street South to Franconia Road East to Telegraph Road.
  • Mill Road will be completely closed between Stovall Street and the Mill Road connector. Detour signs will be posted on the road.

Please use caution when traveling in this area. All construction-related work and dates are subject to change, depending on weather, material and contractor availability or other unforeseen conditions. Go to www.wilsonbridge.com for the latest traffic and project information.

Motorists Urged to Use Alternate
Routes to Avoid Delays

Officials at the Woodrow Wilson Bridge Project, responsible for the construction work occuring in the Telegraph Road area, want you to know that Telegraph Road North will be closed between the Beltway and Duke Street on Tuesday, Wednesday and Thursday nights this week (June 7 – 9, 2011). The closures are to start at 11 p.m. each night and last until 4 a.m.

However, if you find yourself in the area, here is what’s occurring overnight according to officials and this work has the following impacts:

Northbound Telegraph Road:

  • The ramp from northbound Telegraph Road to Eisenhower Avenue and the ramp to the Capital Beltway Outer Loop (I-95/495 North) will remain open each night. During this time, all northbound traffic will need to exit Telegraph Road no later than the ramp to the Outer Loop.
    • Detour for Northbound Telegraph Road motorists traveling to Duke Street: Take the Eisenhower Avenue exit ramp to right at Eisenhower Avenue to the traffic circle to Holland Lane to Duke Street.
  • The Telegraph Road North on-ramp to the Capital Beltway Inner Loop (I-95/495 South) will be closed.
    • Detour: Motorists should turn right onto Huntington Avenue East to left on U.S. Route 1 North to the Inner Loop.
  • The Capital Beltway Outer Loop (I-95/495 North) exit to Telegraph Road North will be closed. The exit ramp to Eisenhower Avenue will remain open.
    • Detour for Outer Loop motorists traveling to Duke Street: Take the Eisenhower Avenue exit ramp to right at Eisenhower Avenue to the traffic circle to Holland Lane to Duke Street.

Additional Impacts:

  • Motorists traveling the Inner Loop (I-95/495 South) will be able to exit at Pershing Avenue, but the exit to Telegraph North/Duke Street will be closed.
    • Detour: Inner Loop motorists wishing to access Duke Street should take the Pershing Avenue exit to right on Stovall Street to left on Eisenhower Avenue to the traffic circle to Holland Lane to Duke Street.
  • Pershing Avenue westbound to Telegraph Road will be closed.
    • Detours: Motorists from the Eisenhower Valley who wish to access Duke Street should take Eisenhower Avenue East to the traffic circle to Holland Lane to Duke Street. Motorists who wish to access southbound Telegraph Road should take Stovall Street to left on Mill Road to Telegraph Road South.

The work outlined above is highly dependent on weather, and may be delayed due to rain. Please use caution when traveling in this area. All construction-related work and dates are subject to change, depending on weather, material and contractor availability or other unforeseen conditions.

For More Information

Go to www.wilsonbridge.com for the latest traffic and project information.

Motorists Strongly Urged to Use Alternate Routes to Avoid Delays

Construction activities throughout the Capital Beltway Telegraph Road interchange will require ramp and lane closures beginning on Saturday, October 2, through Saturday, October 9, 2010. Motorists are advised to use alternate routes during these times.

The following are the details for the ramp and lane closures:

Nighttime Work – Telegraph Road

Sunday, October 3 – Thursday, October 7, 9 p.m. to 5 a.m. the next morning

  • The Telegraph Rd. Southbound Ramp to the Inner Loop (I-95/495 South) will be closed due to roadway construction.
    • Detour: Motorists should take Telegraph Rd. Southbound to Mill Rd. Westbound to the Eisenhower Connector.
  • The left lane of Telegraph Rd. Northbound between Huntington Ave. and Pershing Ave. will be closed due to roadway construction.
  • The left lane of Telegraph Rd. Southbound between Mill Rd. and Huntington Ave. will be closed due to roadway construction.

Monday, October 4, 11 p.m. – 5 a.m. the next morning

  • All lanes on Telegraph Rd. Northbound will be closed between the Eisenhower Ave. Ramp and the Eisenhower Overpass Bridge due to bridge construction.
    • Detour: Beltway bound traffic should use Huntington Ave. Eastbound to Route 1 Northbound to respective entrance ramps; Duke St. traffic should use the Eisenhower Ave. Ramp to Stovall St. Northbound to Pershing Ave. Westbound to Telegraph Rd. Northbound.

Tuesday, October 5, 11 p.m. – 5 a.m. the next morning

  • All lanes of Telegraph Rd. Southbound between Mill Rd. and Huntington Ave. will be closed due to bridge construction.
    • Detour: Motorists should take Duke St. Eastbound to Route 1 Southbound to the I-495 Ramps; Telegraph Rd. traffic should continue to Huntington Ave. Westbound to Telegraph Rd. Southbound; the Mill Rd. exit from Telegraph Rd. will remain open for Eisenhower Ave. traffic

Daytime Work – Telegraph Road

Monday, October 4 – Thursday, October 7, 9:30 a.m. to 3 p.m.; Friday, October 8, 9:30 a.m. to 12 noon

  • The left lane of Telegraph Rd. Northbound between Huntington Ave. and Duke St. will be closed due to roadway construction.
  • The left lane of Telegraph Rd. Southbound between Duke St. and Huntington Ave. will be closed due to roadway construction.
  • The Telegraph Rd. Northbound Ramp to the Inner Loop (I-95/495 South) will be closed due to roadway construction.
    • Detour: Motorists should take Telegraph Rd. Northbound to the Eisenhower Ave. Exit Ramp to Eisenhower Ave. Westbound to the Eisenhower Connector

Motorists are urged to avoid the area and take alternate routes during the dates and times outlined above. Please use caution when traveling in this area. All construction-related work and dates are subject to change, depending on weather, material and contractor availability or other unforeseen conditions.

This improvement is part of the Woodrow Wilson Bridge Project. Visit www.wilsonbridge.com for the latest traffic and project information.

As part of the Woodrow Wilson Bridge Project, the ramp from southbound Telegraph Road to the Inner Loop of the Capital Beltway Interstate 95/495 has been temporarily realigned to allow reconstruction of portions of the ramp related to continuing work widening the Beltway.

The s-shape configuration accommodates one lane of traffic and will remain in place until further notice.
¦lt;br /> Motorists are urged to stay alert and use caution as they navigate this area. All construction-related work and dates are subject to change, depending on weather, material and contractor availability or other unforeseen conditions.